Foothill Drive Curve Realignment Project

General Work Description: Reconfigure the curve on Foothill Drive approximately 1,116' from the City of Vacaville limits. Construct a 32 feet wide roadway section of 2" of 1/2" HMA over 3" of 3/4" HMA over 12" of aggregate base. The work also includes: embankment construction, retaining wall, ditch excavation, concrete v-ditch, adjusting facilities to grade, signage and striping, and potential removal of hazardous waste.
Specifications (click to expand/collapse)