Hay Road Improvement Project 2024

General work description: Edge widening, cold planing, and 3" thick 3/4"-HMA overlay with geosynthetic interlayer on Hay Road from Burke Lane to State Route 113. The work also includes construction of a HMA driveway, roadside ditches, shoulder backing, striping, adjusting facilities to grade, and signage.

The estimated cost of the project is $1,550,000.